A45 Birmingham Airport Flight Pass Protected

Case Study: Temporary VRS

Protecting road workers and passing traffic under the Birmingham airport flight pass

Read more

M50 Bridge Repair – Temporary Vehicle Restraint Systems

Case Study: Temporary VRS

Specialist temporary vehicle restraint systems (TVRS) were installed to protect the bridges, located east and westbound on the M50 motorway, while the intricate repair work was carried out.

Read more

Barriers Help to Keep Traffic Moving During Commonwealth Roadworks Scheme

Case Study: MASS Barriers

The MASS barriers with Siteguard fencing protected the 80-strong team of road workers on the A45 Sprint corridor scheme in Birmingham, ahead of the 2022 Commonwealth Games.

Read more

M5 Central Reservation Upgrade

Case Study: Highways VRS

Highways England manages the strategic road network in England, comprising motorways and some A roads. When steel central reserve barriers are coming to the end of their working life,…

Read more

M5 Worcester Central Reservation Works

Case Study: Temporary VRS

Fully tested to EN 1317: N2 W3, N2 W4, N2 W5, N2 W6 and H1 W6 Varioguard can be installed using the Asset Drilling Rig, providing ZERO Hand Arm Vibration,…

Read more

M5 Central Reserve Upgrade – Vehicle Restraint Systems

Case Study: Highway VRS

The REBLOC RB84XEAL_8 permanent precast concrete vehicle restraint system (VRS) was installed along the 6.5km stretch, protecting road users from barrier breakthroughs along the busy route.

Read more

Barriers Ensure Maximum Safety in City Bridge Reconstruction Project

Case study: Concrete & steel VRS

The A64(M) Regent Street flyover, in Leeds city centre, underwent a £30m upgrade programme, scheduled for completion in spring 2022. As a leading UK manufacturer and supplier of vehicle…

Read more

Hill & Smith Praised for Its Part in Major Bridge Upgrade

Case Study: REBLOC VRS

Hardstaff Barriers supplied new permanent REBLOC and Maxibloc high containment concrete barriers to protect bridge columns on the M8 at Junction 3, Livingston, for BEAR Scotland. The project concluded…

Read more

M6 Junction 21a Manchester Zoneguard and REBLOC

Case Study: Temporary VRS

Zoneguard and REBLOC barriers protecting road workers and the passing public on the M6 by Junction 21a Manchester.

Read more

Associated British Ports (ABP) Immingham Port Safety Barriers

Case Study: Immingham Port Safety Barriers

The Port of Immingham, on the Humber is the UK’s busiest trading estuary. It connects businesses across the UK and the world. It is the UK’s largest port by…

Read more

M74 High Risk Pier Protection

Case Study: REBLOC VRS

As part of Transport Scotland’s strategic trunk road maintenance programme, Scotland TranServ delivered the second phase of a £1.8m programme of protection works to the M74 bridge piers.

Read more

Hinkley Point C – Nuclear Power Station

Case Study: Hinkley Point C Nuclear Power Station

Hinkley Point C, in Somerset is the first nuclear power station to be built in the UK in over 20 years, to provide low-carbon electricity for around 6 million…

Read more

Stansted Airport

Case Study: BlastDefender Barrier

As a trusted supplier of temporary airside barriers and protection products, Hardstaff was appointed by VolkerFitzpatrick to install a BlastDefender fencing system around the construction site to protect the workforce behind…

Read more

Bath Christmas Market

Case Study: Pitagone HVM Barriers

Bath Christmas Market is one of the UK’s most popular festive events, featuring food and gift stalls across the city’s pretty Georgian streets. The award-winning event, which took place…

Read more

Multibloc TVCB Hinkley Point

Case Study: Multibloc Barriers

The Hinkley Point C Park and Ride facilities at Bridgwater, Junction 24 on the M5, include parking for 620 cars and bus parking facilities. It also offers a freight…

Read more

Birmingham Christmas Market 2019

Case Study: Event HVM

Birmingham’s annual Christmas Market is the largest authentic German market outside of Germany and Austria and is the pride of Birmingham’s annual event calendar. Having started in November 2001,…

Read more

Eastbourne Air Show 2019

Case Study: Surface Guard HVM

The Eastbourne Air Show is the UK’s largest, free air show. The event takes place across 4 days every August and includes Battle of Britain memorial flights as well…

Read more

A14 Huntingdon – Temporary Vehicle Restraint System

Case Study: Temporary VRS

The Asset VRS’s range of barriers was used extensively across the scheme; in some weeks the project utilised almost every temporary barrier product within the range, from the Zoneguard…

Read more

Multibloc TVCB M6 J16-19

Case Study: Multibloc TVCBs

Multibloc TVCBs provide a new method of access and egress delineation into the central reserve.

Read more

Zoneguard Vehicle Restraint System – M6 J16-19 Smart Motorway

Case Study: Temporary VRS

The narrow 700mm foot of the barrier enables a wider working area for construction staff, plant and vehicles operating behind the steel barrier. This additional work area width is…

Read more