Varioguard Severn Bridge Suspension Cable Inspection – Vehicle Restraint System

Case Study: Temporary VRS

The Asset Vehicle Restraint System (VRS) is tested to BS EN 1317-2:1998 containment level H2. Galvanised steel elements lock together to make a rigid, energy-absorbing barrier where errant vehicles…

Read more

Varioguard Heysham to M6 Link Project

Case Study: Temporary VRS

Varioguard vehicle restraint system is an important traffic management safety product adopted by Costain and regularly used on highway contracts as part of their supply chain agreement.

Read more

MASS Barrier Worcester Ringway

Case Study: MASS Barrier Traffic Management

Ringway’s highway division was awarded the contract to install a new roundabout system to improve traffic flow close to Worcester’s historic cathedral. The roundabout being installed following a major…

Read more

MASS Barrier Manchester Metrolink 2

Case Study: MASS Barrier Traffic Management

The Victoria Station sections phases I.II and IIICC is the fifth section of the multi-billion pound Manchester Metrolink that MASS has been used to provide carriage and footway safety…

Read more

MASS Barrier Manchester Metrolink 1

Case Study: MASS Barrier Traffic Management

As part of the temporary traffic management for the Manchester Metrolink Phase 3 extensions, Laing O’Rourke used MASS barrier to delineate the works, and to segregate and protect both…

Read more

MASS Barrier System Exhibition Road

Case Study: MASS Barrier Traffic Management

Balfour Beatty Regional Civil Engineering (BBRCE) has been commissioned to reconstruct this public thoroughfare to create an outdoor space that better accommodates the needs of both pedestrians and transport,…

Read more

MASS Barrier Temporary System Birmingham New Street Station

Case Study: MASS Barrier Temporary System

Working with contractors and project managers at Birmingham New Street Station, a bespoke MASS system was designed and fabricated, enabling the station regeneration to commence safely. The station sits…

Read more

MASS Barrier System: Heysham to M6 Link

Case Study: MASS Barrier Traffic Management

MASS (Multi Application Safety System) was chosen by main contractor Costain for Lancashire County Council, to provide increased operational safety to pedestrians, site workers and traffic during the construction…

Read more

Overnight Installation of Zoneguard A14 Kettering

Case Study: Temporary VRS

Asset VRS, one of the Hill & Smith Plc. group of companies, recently completed their first UK installation of Zoneguard temporary steel barrier on the Kettering A14 stretch of…

Read more