M18 J5-6 Central Reserve Renewal

Case Study: Providing Reliable Protection for People Using and Maintaining This Corridor

The central reserve on the M18 was renewed to provide reliable protection for people using and maintaining this corridor. The project replaced the vehicle restraint system (VRS) through constrained…

Read more

Gallows Corner Flyover, A12, Eastern Avenue

Case Study: Improving Site Safety and Operational Efficiency with Incursion Defender

Incursion Defender was trialled during Costain’s major refurbishment and strengthening project on the A12, Eastern Avenue. On behalf of Transport for London (TfL), they were delivering a complex roadworks…

Read more

Enhancing Vehicle Access Control Within a Busy Public Environment

Case Study: Rapid Delivery of a Custom Hostile Vehicle Mitigation Solution for the Bilston Markets Redevelopment

As part of the major redevelopment of Bilston Markets, a bespoke Hostile Vehicle Mitigation (HVM) solution was required to improve perimeter security by preventing unauthorised vehicle access, while complementing…

Read more

How Hill & Smith Infrastructure Supported Controlled Delivery Across a Live Liverpool Site

Case Study: Managing Complex Urban Works Where the Public Can’t Be Moved

Hill & Smith Infrastructure was appointed by RH Traffic Management to support a complex programme of verge works at a busy live site in Liverpool, where maintaining operational control around pedestrians…

Read more

Incursion Defender: A47 North Tuddenham to Easton Dualling, Norfolk

Case Study: Physical Incursion Protection Within a Live Road Closure

A full weekend closure of the A47 on the North Tuddenham to Easton Dualling Project provided a live operational environment for Galliford Try, Hill & Smith Infrastructure and HW…

Read more

A465 Llangua – REBLOC RB80A_8 (H2W1)

Case Study: Vulnerable Ageing Structure Protected with a Modern Concrete VRS Solution

The A465 Llangua scheme showcases the successful integration of modern safety solutions within a historic structure. Completed in December 2025, the project upgraded the Vehicle Restraint System (VRS) on…

Read more

M27 Southampton – SentriGate

Case Study: Automated Access Control Solution to Save Costs on Highway Roadworks

The M27 Southampton scheme required CR Civil Engineering to manage access across a shifting work zone. To address challenges around mobility, automation and cost, Hill & Smith Infrastructure supplied…

Read more

A34 Three Maids & A379 Exeter Bypass

Case Study: Extending the Life of Vital Bridge Structures

National Highways and Devon County Council faced significant risks to ageing footbridge structures on the A34 Three Maids Hill and A379 Exeter Bypass. To avoid costly replacements and improve…

Read more

M40-M42 Interchange & M42 J4-7 DHS

Case Study: Where Innovation Meets Environmental Sustainability

Hill & Smith Infrastructure, BmJV and their delivery partners implemented a pioneering approach to central reserve Rigid Concrete Barrier (RCB) installation across two major schemes on the Strategic Road…

Read more

M1 J10-13 Smart Motorway Upgrades

Case Study: Temporary Vehicle Restraint System Installed on the M1

Supply and installation of temporary vehicle restraint systems (VRS), enabling a central reservation upgraded on one of the UK’s business motorways corridor

Read more

BBV M42 Corridor HS2

Case Study: Temporary Vehicle Restraint System on the M42 for HS2

HS2 is the UK’s largest infrastructure project, designed to improve connectivity between London, the Midlands, and the North. Along the M42 corridor – a critical section intersecting with the…

Read more

A27 Shopwyke – Delivering a Complex Barrier Solution

Case Study: Flagship Scheme

The A27 Shopwyke project, completed in May 2024, involved the installation of a concrete barrier to protect the piers of a footbridge situated at the edge of a busy…

Read more

Enhancing Traffic Management at Oxford Station Expansion with SentriGate

Case Study: SentriGate Traffic Management

Four strategically positioned SentriGates took over the entrances, exits, and vital checkpoints around the Junction of Botley Road and Cripley Road, a crucial traffic point. Under the vigilance of…

Read more

A303 Plant Crossing – SentriGate Case Study

Case Study: SentriGate Access Control

Following advice from leading vehicle restraint system (VRS) experts at Hardstaff Barriers, it was decided that a physical barrier would also be used in addition to the traffic signals.…

Read more

Iconic Interchange Protected with Vehicle Restraint System

Case Study: Bespoke Temporary VRS

The barrier works at the Brent Cross Interchange have been completed with a bespoke solution from Asset-VRS.

Read more

M6 All Lanes Running (ALR) Project

Case Study: Multibloc VRS

The pre-painted red and white Multibloc TVCB were installed 4.3m from the running face of the temporary studs and the line of the traffic in the central reserve as…

Read more

Road Barriers Protect Medieval Peak District Bridge – and Its Appearance

Case Study: Temporary VRS

Asset VRS was selected by Jackson Civil Engineering to install a suitable vehicle restraint system (VRS) on the bridge, as part of the Environment Agency scheme.

Read more

Protecting the Queen’s Funeral with HVM

Case Study: HVM Barriers

Mourners who visited Queen Elizabeth II’s funeral and paid their respects in Westminster were protected from the threat of vehicle-borne attacks thanks to years of meticulous planning and one…

Read more

Historic M1 Footbridge Protected Thanks to Installation of World-First Road Barrier

Case Study: REBLOC VRS

The historic Smithy Wood footbridge over the M1 needed increased protection in the event of a collision, but limited space at the roadside meant there were few options available.…

Read more

M5 Exeter Road Safety Barrier

Case Study: Temporary VRS

Varioguard protecting both road workers and passing traffic on the M5 near Exeter

Read more